Published by DAYU-X
Scope and source
Company technical guidance · Industrial coating selection evidence
A selection workflow for defining the surface, exposure, protection objective and feasibility of preparation, application, cure and inspection before model-level review.
This checklist does not replace product-specific instructions or the approved project specification. Unresolved inputs that could change the system route require verification before release.
Evidence inputs before coating selection
- Define the equipment, surface boundary and decision owner.
- Record the substrate, retained layers, existing condition and access constraints.
- Describe operating, startup, shutdown and cleaning exposure using available records.
- Separate corrosion, wear, thermal and solar-heat objectives instead of assuming one function supplies another.
- Check preparation, application, cure, inspection and maintenance feasibility against the candidate route.
- Document rejected routes and assign unresolved inputs a verification action before release.

