Confirm pre-job handover and drawing requirements
Identify the equipment, work zones, coating boundaries, interfaces with adjacent systems and the drawing or specification revision in force. Confirm safe access, lighting, ventilation, nearby work and protection of completed surfaces.
- Mark surfaces included and excluded from coating.
- Identify assembly faces and components requiring access later.
- Assign preparation, application and inspection release roles.
- Record unresolved fabrication or repair work before coating starts.