Divide the tank exterior into exposure zones
Walk the exterior from the roof to the foundation interface and mark changes in geometry, drainage, shade, contamination and access. Link each observation to a location system that can be used during preparation and later maintenance.
Roof and upper shell
Review solar exposure, standing water, penetrations, roof seams, vents, handrails and areas where maintenance traffic or deposits can damage the existing finish.
Shell, bottom ring, welds and attachments
Inspect condensation paths, splash or soil influence, foundation interfaces, welded attachments, nozzles and details that retain water or interrupt coating continuity.

