Scope, isolation, and shutdown handover
Confirm the exact panel, elevation and work boundary before access is released. Record isolation status, ventilation, lighting, access equipment, nearby work and the conditions that must be maintained during preparation, application and cure.
- Identify the responsible handover and release roles.
- Mark exclusions, repairs and interfaces with adjacent systems.
- Confirm safe access to front, side and transition areas.
- Protect accepted work from concurrent dust, moisture and hot work.

